Concrete Vinyl Flooring – Tufdek™

Finished vinyl wood plank decking on the front deck of a home

Concrete Vinyl Flooring – Tufdek™

TUFDEK CONCRETE INSTALL

CURING TIMES FOR CONCRETE

Consult concrete curing tables to verify the time required for any new concrete to cure fully. The cure times will vary depending upon the thickness of the slab and the type of concrete, lightweight or regular. Installing concrete vinyl flooring over uncured concrete may result in bubbling or delamination due to trapped moisture. A reasonable period of time to wait for concrete to cure (hydrate) completely is:

  • Slab above grade is 28 days
  • Lightweight concrete is 14 days

SURFACE CONDITION OF CONCRETE

The slab must be free of curing compounds, loose paint, plaster, and all other foreign matter. Fill minor imperfections with our Tufdek Deck Patch. It may be necessary to remove all foreign matter or raised areas mechanically. The surface must be relatively smooth steel trowel finish with the proper slope for drainage.

 

A TEST FOR SEALED SURFACE

Some concrete will have sealers applied that are not visibly evident. To test for sealer presence, pour one cup of water on the surface. If it beads or is not absorbed into the concrete after 20 minutes then a sealer has most likely been used. Tufdek Vinyl Decking should not be installed over any existing sealants to avoid issues of compatibility.

INSIDE WALL TERMINATIONS

Running the Tufdek membranes up intersecting walls is a critical detail for effective waterproofing. When working on concrete surfaces, the upturn areas will often have very uneven sections left over from the concrete forming. These areas must be ground and cleaned to get a proper waterproof seal and avoid punctures from the backside. Counter flashing and reglet should be incorporated into the finished details on upturn walls where brick is used.

 

concrete vinyl flooring

 

OUTSIDE DECK EDGE TERMINATIONS

Terminating at the outside deck edge on concrete requires pre-construction planning, the most common method is to have a wood board cast in the concrete during construction giving you something to nail your Tuff-Clad PVC Metal Flashing to. The general contractor could also fasten a piece of lumber to the outside edge after the concrete is placed creating the same mounting area. Lastly, you could adhere to your flashing to the concrete with a high-quality construction adhesive or use a mechanical fastener and fasten the membrane to the deck edge. If the balcony area is higher than five stories we advise you to confirm wind loads in case mechanically fastening the deck edge may be the only option to avoid the membrane from lifting during high winds.

CONCRETE CONDITIONS TO AVOID

  • Uncured concrete
  • Slab on or below grade that has any hydrostatic pressure. This condition would also occur around cast in place planters, ramps or stairs built into sloped grades
  • Suspended concrete slabs that have an existing waterproofing membrane or steel deck or pan installed under the slab
  • Slabs that have questionable integrity. Evident by slab deflection, large, irregular or radiating cracks
  • Poorly finished or very rough concrete

CONTACT US TODAY

For more information about using Tufdek Waterproof Vinyl Decking as your concrete vinyl flooring contact us today and speak with our team about an Authorized Tufdek Dealer in your area.

Share this post


error: Content is protected !!